MORE PICTURES

First picture is me in my haz-mat suit after the ceiling was sprayed. The paint is designed to fall and become a dust that vacuums up. It is like fine drywall dust only black and gets all over everything.
Second picture is me standing in the reception area just prior to putting down the cork flooring.
Third is Ted and I on one of the 5 flooring days.

Leave a Comment

Submit Comment

CommentLuv badge

1 Comment or Trackback

  • Posted by Gerri on September 09, 2010 at 5:38 pm

    Wow, you did so much work! The new place looks and is amazing. See you soon! 🙂